Teltonika router + switch installation guide
This document is an installation guide for router and switch upgrade on INCH DUO EV charging stations.
You will need a standard small-head flat screwdriver and zip tie cutter.
1. Package parts
The package contains:
LTE Router TELTONIKA RUT240 (PEM-0723)
Router holder clamp (PME-0745)
Power supply (PPS-1157)
Switch (PEM-1059)
Wiring for router (PCG-1151)
Wiring for switch (PCG-1153)
Wiring for power supply (PCG-1334)
UTP cable 0.5 (PCE-1156)
UTP cable 0.25 (PCE-1118)
Adapter SMA plug to UMRF jack (PEX-1645)
Two zip ties (PMF-1032)